TRANSPORT FROM THE SHIP TO THE TRANSFORMER BASIS 224 TONS
Transformer loading in the port of Gdańsk by floating crane MAJA from the vessel onto railway carriage
Transformer after trans-shipment at the railway carriage
Trans-shipment from railway carriage onto trailer by the application of hydraulic remote cylinders and sliding beams
Oversized set with ABB-transformer loaded onto heavy modular trailer – ready for trip
The transformer on the target place – Highest Voltage Switching Station
The transformer positioning after uploading by sliding method